Challenges How It Works Solutions ROI Savings Why SmartPark Plans Contact Us
EMS · ESG · AI · Smart Living Solutions

Malaysia’s First
AI-Integrated Energy-Saving Plan
with Smart Dimming Technology

Smart lighting that senses, dims, and reports on its own. Proven in Malaysian buildings. Zero CapEx.

SIRIM Approved IECEE CB Certified ISO 9001:2015
90%
Max energy saving
3 Watt
Avg consumption
60,000
Hours lifespan

Certified to International Standards

Certification mark
Certification mark
Certification mark
Certification mark
Certification mark
Certification mark
Certification mark
Certification mark
Certification mark
Certification mark
The Problem

Your Car Park Is Burning Money Every Hour

Most Malaysian car parks burn full-power lighting around the clock, whether a car passes or not. The costs show up in three ways.

Wasted Energy, Rising Bills

  • Lights run at 100% even when no one’s there
  • TNB bills climb month after month

Endless Maintenance

  • Constant bulb replacements & callouts
  • Extra load on your maintenance budget

Complaints & Safety Gaps

  • Dark spots appear when tubes fail
  • Guards patrol just to find dead lights
The Better Way

SmartPark AI: the First Choice for Smarter Energy Savings

Compare today's energy-saving solutions and discover why SmartPark AI stands out as the smarter, more reliable choice for car park lighting.

Traditional Sensor

Energy saving 15–25%

  • May not detect at longer distance
  • Lights may not turn on early enough
  • Sudden lighting feels uncomfortable
  • Safety risks in blind spots

Timer Solution

Energy saving 10–20%

  • Fixed schedule, no real-time detection
  • Energy still wasted in low-traffic periods
  • Manual switching needed in bad weather
  • Inflexible, often insufficient lighting
How It Works

Intelligent Lighting Powered by Adaptive Dimming

SmartPark AI integrates adaptive dimming technology with an intelligent lighting system that responds in real time, brightening the path ahead of moving vehicles and dimming unused areas to as low as 1%.

Stepless Dimming, Microwave Sensing

Lights turn on when vehicle or human motion is detected and automatically dim when no motion is present. Dimming levels from 1–100% can be adjusted on the platform to match your building's requirements. Brightness ramps smoothly, never suddenly.

Localized Group Sensing

Tubes work as teams: when any tube in a group detects a vehicle or person, it triggers the whole group simultaneously, so lighting arrives before you do. Group logic is stored in each tube's built-in intelligent chip, keeping operation stable, safe and reliable even offline.

Adaptive Brightness

Your Lighting, Your Settings

Customize your lighting to match your needs. Set how bright the lights should be and how long they stay dim. When a car or person is detected, the lights brighten automatically. When the area is clear, they return to the selected dim level.

  • Adjust the brightness from 10% to 100%
  • Set the lighting duration from 1 to 300 seconds
The Hardware

The Hardware: Smart Tube & Gateway

A smart tube that senses and dims itself, and a gateway that connects every tube to the cloud.

AI Smart Tube, Bluetooth & Microwave T8

AI Smart Tube · Bluetooth & Microwave T8

The light that thinks for itself

Wireless ConnectionLocal Bluetooth Offline AutomationRemote ManagementStatus Feedback
12W
dims 0–12W
150 lm/W
efficacy
10+ yrs
60,000 h life
5–8 m
detection range
IoT Gateway Pro

IoT Gateway Pro

4G / Wi-Fi / Network cable, the bridge to the cloud

Wi-FiZigbeeBluetooth Remote ManagementStatus Feedback
400
200 Zigbee + 200 BT
35 m
indoor range
265 m
outdoor range
3
uplinks: 4G/Wi-Fi/LAN

One gateway typically covers an entire parking floor. Final layout is confirmed during your free site survey.

The Software

Cloud Energy Usage Analytics

A cloud Energy Management System (EMS) plus a mobile app for monitoring consumption, savings and device status.

Total energy today
201,250 kWh
Energy saving rate
83%
Devices online
153
Carbon vs baseline
-8 tCO₂e
  • Real-time control & data collectionLive dashboards for consumption, comfort and environmental indices, with automated dimming schedules.
  • Excel / CSV / PDF report exportHand your JMB a ready-made savings report, no manual spreadsheets.
  • Carbon & ESG trackingCumulative carbon reduction reporting, aligned with Green Building Index goals. ISO 9001:2015 certified (SIRIM QAS).
  • Multi-building comparisonCompare consumption across buildings and locations from one screen.

The Only Smart Lighting Solution in Malaysia Offering Full Software and Mobile App Control

On / Off & sensor mode Idle 10% ↔ Motion 100% Sensitivity: low / mid / high
Contact Us
Why Now

TNB AFA & Electricity Cost Trends

AFA, the Automatic Fuel Adjustment, is the fuel surcharge on your TNB bill. It is reviewed monthly, and the trend is up.

Source: myTNB official tariff ↗
+2.59
Jun–Jul 2026
+8.33
Aug 2026 proj.
+8.94
Sep 2026 proj.
+8.04
Oct 2026 proj.
Official myTNB AFA rate chart, August 2025 to July 2026

Source: myTNB published AFA rates (Aug 2025 – Jul 2026) and 3-month projection. Values in sen/kWj.

01

Media reports highlight rising electricity cost pressure, covered by The Edge, The Star and Berita Harian.

02

AFA for April 2026 was announced with a slightly lower rebate, meaning higher effective rates for buildings.

03

Energy-saving solutions are increasingly important for building operators who want to protect their budgets.

THE EDGE The Star Berita Harian

Malaysia is moving. The 13th Malaysia Plan (2026–2030) backs energy-efficient smart buildings.

ESG Smart Buildings & Cities AI & IoT Automation Carbon Reduction
Rancangan Malaysia Ketiga Belas (RMK13), 2026-2030
Your Numbers

Annual Savings on the TNB Bill

Based on real measured data: conventional 18W tubes vs AI Smart Tubes averaging 3W. Adjust the sliders to match your building.

Your car park

Defaults reproduce our reference case: 1,000 tubes × 12 h × 360 days. AI Smart Tube average consumption 3W (10%–100% adaptive dimming).

Current annual usage77,760 kWh
Current annual costRM 41,524
With AI Smart Park: usage12,960 kWh
With AI Smart Park: costRM 6,921
Estimated saving: Year 1
RM 34,603
Year 1
RM 34,603
Year 3
RM 103,809
Year 5
RM 173,015
Real TNB electricity bill from a car park site
Real TNB bill from a car park site
Trust & Compliance

Hardware Compliance & Certification

The hardware carries internationally recognized safety and quality certifications. Certificates and test reports are available on request.

SIRIM

Certificate of Conformity, compliant with Malaysian safety & electrical standards. Type-approved LED driver (IEC 60730).

IECEE CB

The international "gold standard" for electrical safety testing, a direct pathway to CE, SIRIM, CCC, KC and RCM approvals.

BACL

60,000-hour lifespan test report from BACL, headquartered in Silicon Valley, USA, internationally accredited and recognized worldwide.

EVERFINE

Photometric test reports, CNAS accredited, ILAC-MRA recognized, compliant with IEC/CIE standards accepted by global certification bodies.

Compare Us

AI Smart Park vs Other Providers

A feature-by-feature comparison of AI Smart Park against a typical lighting provider.

Recommended
FeatureSmartPark AITypical Market Service Provider
Certification✓ SIRIM approved, Malaysian safety & electrical standardsNo SIRIM certification mentioned
Proof of Concept✓ Free POC, real before/after readings verifiedUsually none; savings estimated upfront
Average power usage✓ 3W average thanks to AI dimmingHigher, from conventional sensor/LED systems
AI technology✓ Built-in AI chip, 10–100% smart dimming on movementTypically fixed brightness at lower watt
Energy Management System✓ Cloud + Local EMS, monitor, analyze, detect faults remotelyUsually no integrated EMS
Contract flexibility✓ Annually renewable, flexible for management / JMB / MC10-year fixed contract commonly required
Maintenance monitoring✓ Automatic fault reports through EMSUsually requires manual inspection
Estimated energy saving✓ Up to 65–90% with AI dimming technologyTypically lower, depending on sensor/timer setup
Cooperation Models

Cooperation Models: Buyout & Zero CapEx

Buyout Model

You own the system from day one

Enjoy up to
100% savings on your TNB bills.
  • 5-year warranty, option to extend after year 5
  • 5 years of cloud platform usage included
  • Free energy-saving solution design & deployment
  • Free maintenance within 5 years
  • Free installation
Discuss Buyout
Most Popular with JMB / MC

Zero CapEx Model

Malaysia's first annually renewable contract, aligned to strata terms

We invest. You benefit.
100% funded by us.
  • No upfront payment, start without any initial payment
  • No deposit, zero financial burden
  • Zero investment, free design, deployment, installation & maintenance
  • 5 years of cloud platform usage included
  • Annually renewable, no 10-year lock-in
Start with Zero CapEx Profit sharing arranged after your free on-site survey

Both models begin with the same free Proof of Concept, measured on your own building.

Zero-Risk First Step

The Zero-Risk, FOC Proof of Concept

Upon approval of the POC proposal, the schedule is finalized from your agreed start date. Four steps, zero cost.

ZERO RISK 100% FOC
★ 100% Free of Charge, no payment, ever, for the POC
01
Install an IoT meter

We measure your car park's existing energy usage, your real baseline, not an estimate.

02
Replace existing lights with AI Smart Tubes

A representative zone is upgraded to the adaptive dimming system.

03
Monitor readings on the mobile app

You watch the before/after consumption live, full transparency.

04
Results report presented to your committee

We prepare the POC results and present the findings during your meeting.

Real POC data: daily consumption
-45%
Before After AI Smart Tubes
EMS dashboard: daily energy consumption before and after SmartPark installation
Live Deployments

Reference Installations

Top Glove Tower
85%+ energy savedTop Glove Tower
Mines 2
87%+ energy savedMines 2
The Arcuz by EXSIM
79%+ energy savedThe Arcuz by EXSIM
Setia Sky Residences
81%+ energy savedSetia Sky Residences
Residensi Zahra 1
82%+ energy savedResidensi Zahra 1
The Stellar Condominium
76%+ energy savedThe Stellar Condominium
Top Glove Tower
85%+ energy savedTop Glove Tower
Mines 2
87%+ energy savedMines 2
The Arcuz by EXSIM
79%+ energy savedThe Arcuz by EXSIM
Setia Sky Residences
81%+ energy savedSetia Sky Residences
Residensi Zahra 1
82%+ energy savedResidensi Zahra 1
The Stellar Condominium
76%+ energy savedThe Stellar Condominium
Suria KLCC
Smart LightingSuria KLCCPremium Parking Zone
Sunway 163 Mall
Smart LightingSunway 163 MallParking Lot P1
Bandar Sunway Sunway Medical Centre
Smart LightingBandar Sunway Sunway Medical CentreTower D, B2 · 24/7
IJM-MEZZO
Smart CommunityIJM-MEZZOIoT-ready across the community
Suria KLCC
Smart LightingSuria KLCCPremium Parking Zone
Sunway 163 Mall
Smart LightingSunway 163 MallParking Lot P1
Bandar Sunway Sunway Medical Centre
Smart LightingBandar Sunway Sunway Medical CentreTower D, B2 · 24/7
IJM-MEZZO
Smart CommunityIJM-MEZZOIoT-ready across the community
Get Started

Contact Us

The proof of concept begins with a free site survey; results are measured on your building and presented to your committee.

We usually respond within one working day.